When charging time becomes a competitive factor: DC fast-charging stations charge electric vehicles in minutes rather than hours – at fleet sites, in front of retail outlets or in public spaces.

Understanding the technology

Direct current straight into the battery

With AC charging, the vehicle first converts the alternating current itself – and the built-in rectifier limits the power. DC fast chargers have the power electronics in the charging station: the direct current flows straight into the vehicle battery, typically at 50 to 400 kW.

  • 50–150 kW: solid fast charging, e.g. while shopping – depending on the vehicle, around 100 to 200 km of range in about 30 minutes
  • 150–400 kW (High Power Charging): fast-charge-capable vehicles charge from 10 to 80 percent in around 20 to 30 minutes – short stops are enough
  • The vehicle always determines the actual charging power – the station delivers what the battery can accept
Charging powerTypical useRange per 20 min*
50 kWEntry level, existing sitesapprox. 80–120 km
150 kWFleets, retailapprox. 150–250 km
up to 400 kWMotorway services, charging parksseveral hundred km

* Guide values; depending on vehicle, battery condition, charge level and temperature.

Fast charging in figures

Minutes instead of hours

0
Charging power of modern high-power chargers – up to
0
Typical charging break for several hundred kilometres of range – from approx., depending on the vehicle
0
Usual target charge level for fast charging – above this the battery throttles the power
0
Charging points per station – many DC systems supply several vehicles at the same time

Locations

Where fast charging pays off

DC fast chargers are worthwhile wherever vehicles stop only briefly – or need to be ready for use again quickly.

Fleet sites

Delivery vehicles, care services, service technicians: fast charging between two trips keeps your electric fleet in operation – plannable and without downtime.

Retail

Charging while shopping retains customers and extends their dwell time. The charging station in the car park becomes a footfall driver for your location.

Motorway services & traffic routes

On motorways and trunk roads, every minute counts: high-power charging with high availability makes your location a firm fixture for long-distance travel.

Public space

With public fast-charging points, municipalities and utilities create charging options for everyone – including residents without their own parking space.

Planning & operation

Grid connection, backend and calibration law – we consider it all

Grid connection

Fast chargers require substantial connection capacity – depending on the scale, up to the range of a dedicated transformer connection to the medium-voltage grid. We check the capacity at the site, coordinate the connection with the grid operator and size the system economically.

Billing & backend

Anyone selling charging electricity in Germany needs calibration-law-compliant metering and transparent billing for each charging session. We connect your charging stations to a backend – with access control, roaming, monitoring and analysis.

Service & availability

A charging station only earns money when it is running. On request, we take care of maintenance, fault management and remote monitoring – for consistently high availability of your charging infrastructure.

The grid connection at your preferred location isn't enough for fast charging? Then battery-buffered fast chargers (DC/DC) are the solution: an integrated storage buffers the charging power – entirely without costly grid expansion.

Fast charging at your location?

We assess the grid connection, cost-effectiveness and funding options – and support you from site analysis to ongoing operation.